Borgata Hotel and Casino

Collavino Northeast Construction

"This letter is to inform Hi-Lite systems of Collavino's success at meeting our schedule restrictions for a fifty story casino building utilizing Hi-Lite's fly-form I table system and aluminum post shores,

Collavino had begun the typical levels of the tower in early July 2001 and was required to complete all typical floors within fifty-two weeks of our start date. As of June 19, 2002, all typical floors were completed and roof construction was beginning.

Construction of the typical floors could have been completed sooner however our operations had lost roughly twenty-four working days overall throughout the course of. In order to achieve our schedule Collavino's crews consisted of twelve employees during the day and eight employees on an evening shift, however this was due to the difficult floor plane that we were required to construct, if the building footprint was less complicated a second shift would not have been required.

In conclusion, Collavino was extremely pleased with the performance of the equipment purchased from Hi-Lite to construct the typical floors. Collavino thanks Hi-Lite for their professionalism in coordinating the layouts and taking the time to train our employees how to use this system effectively and efficiently In order to allow for the best possible production and performance."

Paolo M. Collavino
Project Manager


Borgata Hotel and Casino

Weatherby Construction

"I would like to take this opportunity to thank you for your efforts and performance on our 50 story tower for the Borgata Water Club project in Atlantic City. Your 70' flying tables performed as promised, resulting in a safe and efficient shoring operation on a project that I trust was as successful for you as it was for Weatherby Construction.
 

Your engineering support was critical on this highly visible project and your timely response to our never ending requests for signed and sealed calculations was greatly appreciated. As you know, we were able to completely cycle 8000 sf of typical floor shoring in less than 2 hours and, on a project where the crane time was at a premium, this kind of speed impacted all other crane dependent tasks, allowing us to meet our contract schedule obligations.
 

These light weight aluminum tables were fantastic and I would be happy to be a reference for your firm if that is something you would like. Once again, thanks for your help and we look forward to working together again, hopefully soon. "
 

Richard T. Bischoff
Vice President/General Manager


Jamaica Train Station

Perini Tutor-Sallba JV

"Perini/Tutor-Saliba was satisfied with the use of Hi-Lite's 'Fly Form' as the base for various temporary platform layouts on the referenced project.

The installation of this system was not a typical use, but we found the system easy to install and its adjustment and modification capabilities allowed us the flexibility to adapt to the numerous field conditions that occurred working in an active railroad station.

Hi-Lite's personnel provided us with all of the necessary technical support and drawings as well as on site support for erection of a platform mock up. They also responded to the daily field modification issues in an expeditious manner."

Jay A. Gold
Project Engineer
  


Boulevard Des Allumettieres

 

G.T.S.

"We greatly appreciated our first experience with your aluminum overhang brackets. As can be seen in the enclosed Pictures we have first hand experience on this particular job since we used both systems: the conventional steel overhang brackets and the Hi-Lite aluminum overhang brackets.

Their manipulations and Installation is by far much faster than the conventional steel brackets" 

  

 

Francesco Colatrella
Project Manager
  


Harrah's Casino

Madison Concrete Construction

"As the Concrete Subconctractor for the new Harrah's Bay Tower II in Atlantic City, we were greatly satisfied with the use of the Hi-Life Truss Form System for the cast in place concrete decks.

Harrahs Bay Tower II is a 46 story structure in which we achieved a three day cycle on the typical floors. On the non-typical floors, the Hi-Lite Truss Form System was adjusted to accommodate the varying floor to floor heights. Directions and modifications to the Hi-Lite Truss Forming System were easily communicated to us by your technical support staff during the duration of the project.
 

Overall, the Hi-Lite Truss Forming System was a great benefit and allowed us to improve on the overall concrete schedule, which was welcomed by the General Contractor as well as the Owner."

Carl Sparano
Project Manager